1st Annual Dues Payment by September 30th

  • Home
  • Meetings & Agendas
  • Loch Isle Community
    • Our Pets
    • Vendors List & Resources
    • 2025 Special Assessment
  • Road Restoration
  • Have You Heard?
  • Download Center
    • Forms
    • Exterior Modifications
    • HOA Documents
  • Town of Miami Lakes
    • Miami Lakes Calendar
    • Town Guide
    • Mainstreet -A Social Hub
    • Miami Lakes Athletic Club
  • Helpful Links
    • Community Contact Numbers
    • Our Elected Officials
    • Miami Lakes K8 Center
    • HOA Florida Statues
  • More
    • Home
    • Meetings & Agendas
    • Loch Isle Community
      • Our Pets
      • Vendors List & Resources
      • 2025 Special Assessment
    • Road Restoration
    • Have You Heard?
    • Download Center
      • Forms
      • Exterior Modifications
      • HOA Documents
    • Town of Miami Lakes
      • Miami Lakes Calendar
      • Town Guide
      • Mainstreet -A Social Hub
      • Miami Lakes Athletic Club
    • Helpful Links
      • Community Contact Numbers
      • Our Elected Officials
      • Miami Lakes K8 Center
      • HOA Florida Statues
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Meetings & Agendas
  • Loch Isle Community
    • Our Pets
    • Vendors List & Resources
    • 2025 Special Assessment
  • Road Restoration
  • Have You Heard?
  • Download Center
    • Forms
    • Exterior Modifications
    • HOA Documents
  • Town of Miami Lakes
    • Miami Lakes Calendar
    • Town Guide
    • Mainstreet -A Social Hub
    • Miami Lakes Athletic Club
  • Helpful Links
    • Community Contact Numbers
    • Our Elected Officials
    • Miami Lakes K8 Center
    • HOA Florida Statues

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

2025 Special Assessment - Road Restoration

Schedule

Schedule

Schedule

Calendar

Gallery

Schedule

Schedule

Coming Soon

Documents: Notices, Contract, Fiancials

Click To Request Special Assessment NoticeClick to Request Arborist Evaluation and ReportClick to Request Road Restoration ContractClick To Request Road Restoration Fiancials

Process & Updates

Phase One: Planning and Preparation

Secure 90% of SP Assessment Total

Due 7/11/2025; Completed

 As per the Special Assessment stipulations, in order to meet the contractor’s payment schedule, 90% of the required funds must be secured in advance. This ensures that we remain on track with project timelines and fulfill our contractual obligations without delays. 

Certified Arborist Evaluation & Consult

Due 4/30/2025; Completed

 Complete an arborist tree review  to ensure compliance with City of Miami Lakes Ordinance No. 12-151 and to support our community’s road resurfacing goals. This review helps protect our tree canopy while allowing necessary infrastructure improvements to proceed responsibly and in accordance with local environmental regulations. To request a copy of  the arborist report please scroll up and click on Request Arborist Evaluation and Report.

Action Items from Arborist Evaluation

Due 6/30/2025; Ongoing

  1. Consult with Legal Counsel Review legal considerations related to tree removal, easements, &  homeowner responsibilities. 
  2. Meet with the Town Arborist Coordinator
  3. Secure Vendor for Tree Removal Services
  4. Engage with Identified Homeowners
    Discuss tree-related findings and necessary actions on or near their properties.
  5.  Obtain Homeowner Approvals for Tree Removal


Phase Two: Pre Road Tasks

Permitting

Due 8/1/2025; Completed

Collect and deliver all required paperwork  to the Town of Miami Lakes Building and Zoning Department.

Tree Removal

Due 8/4/2025; Pending

Tree removal company will be onsite removing 9 identified trees located mostly on the west side along the perimeter wall.

Utilities

Due 8/11/2025; Completed

 

While the permit is awaiting approval, Sunshine 811 will be contacted to locate and flag underground utilities such as gas, water, and power lines. This is a free service.
If you would like to learn more, please visit their website: https://sunshine811.com/


Phase Three: Road and Curb Restoration and Resurfacing

Curb Restoration

9/8/2025 -9/22/2025

 Identified irreparable curbs will be demolished and restored along the 5 roads within the community. In accordance with the Arborist Report, specific trees and their root systems have been evaluated to determine whether a standard surface-level curb (C-Type) or a recessed curb (D-Type, penetrating approx. 6 " below grade) is appropriate. This work will be conducted in compliance with the Arborist’s recommendations and all applicable Fl. State laws governing the protection of trees.

Milling

10/20/25-10/24/2025

 

  • What it is: The process of removing the top layer of an existing asphalt or concrete surface.
     
  • Purpose: Prepares the surface for repaving or overlay by smoothing out uneven areas, removing damaged pavement, and maintaining proper height and drainage.
     
  • Equipment used: Milling machines (also called cold planers).
     
  • Typical depth removed: Varies, but often 1–3 inches.

Overlay

10/27/2025-11/5/2025

 

  • What it is: Placing a new layer of asphalt (usually 1–2 inches thick) on top of an existing surface, with or without removing the old pavement (though milling may be done first in some cases).
     
  • Purpose: Used to improve the appearance and extend the life of a road that is still structurally sound but may be showing signs of wear.


Phase Four

Pressure Washing & Painting Curbs

TBD

Sealing

TBD

About our contractor:southern asphalt & Engineering

Serving Miami Dade and Broward County for more than 20 years, Southern Asphalt & Engineering specializes  in complete asphalt roadway and parking lot pavement restoration & maintenance services.  For more information about SAE - please visit: www.https://southernasphaltengineering.com/